Finally!
As was expected, once MAG was deployed, getting the rest of the pieces up were trivial and those are burning in as I type this. I did a couple of sanity test runs just to make sure the pieces do what they’re supposed to do, and now we’ve got a new rather pretty dashboard up:

https://tetsuo.silogroup.org/dsh
I topped it up to about a grand to play with to get it moving. It’ll be another week or so of minor adjustments here or there for it to pick up momentum.
Man oh man, what a long project this was.
I talk about it like it’s over, but, this was just the “hard part”. There are still tons of things to do with this. SAP and EXP are generating data but aren’t currently being used in forecast rankings, and those two pieces need some TLC before that can happen, so, I would consider this an “MVP” at best.
For example, there was an issue with the BUY component that required me to hotfix it an hour after it was supposed to have cycled its holdings, which caused it to lose money when it would have otherwise made money.
I am also seeing that its not pulling the numbers as consistently as are reported and backtested so it does appear there is some overfitting. This is all a learning process though, so, just stuff to look at.
Fixing any issues that prevent it from just running itself first is top priority, and then like I said, SAP and EXP integration into forecast ranking, maybe a little polishing of how configuration is done for SIG and MAG, etc.
After that gets to a certain point I’ll need to transition back over to Dark Horse Linux, as I recall I was working on a new package manager, DPM, before this rebuild that I needed to step away from to keep from burning out on it.
I think that did it.
I do need to step away from the screen for a bit though, so, it may be time again for a mini-vacation soon.
And it’s definitely time for an office rebuild.